Chinese Construction Project Power Distribution System Case Study

Case Study Of Power Distribution System In A Chinese Construction Project

Figure 1 - On-site Acceptance of Low-Voltage Distribution System

The picture shows the project's low-voltage distribution room. The GCS/MNS series low-voltage drawer cabinets provided by our company have been installed and are currently undergoing on-site acceptance checks before powering up. The cabinets feature strong breaking capacity and easy maintenance, allowing flexible outgoing circuit configurations, and provide stable power supply for building lighting, power, and other loads.

Case Study Of Power Distribution System In A Chinese Construction Project

Figure 2 - Medium Voltage Switchgear System Acceptance

The picture shows the medium voltage distribution room of the project, where all KYN28A-12 series medium voltage switchgears have been fully installed. Technicians are checking the equipment item by item. This series of switchgears has complete protection and interlocking functions, effectively ensuring the safe operation of the building's power supply system, and is the core equipment of a large building's distribution system.

Case Study Of Power Distribution System In A Chinese Construction Project

Figure 3 - Transformer Outgoing Cabinet Inspection

Technicians are performing a functional check on the transformer outgoing cabinet. The cabinet is equipped with an intelligent protection and control device, which can protect, monitor, and control the transformer circuit, providing a reliable protective barrier for the building's main power distribution system.

Case Study Of Power Distribution System In A Chinese Construction Project

Figure 4 - Complete Medium Voltage Switchgear System

The complete medium voltage switchgear units are neatly arranged, with clear labels on the cabinets and well-defined functional zones. All equipment undergoes strict factory testing before leaving the manufacturer, and upon arrival on site, they are inspected together with the project team to ensure that both performance and installation quality meet project requirements.

Case Study Of Power Distribution System In A Chinese Construction Project

Figure 5 - Overall Acceptance of Complete Power Distribution System

Technicians are conducting an overall acceptance inspection of the complete high and low voltage power distribution system. The high and low voltage complete equipment we provide fits perfectly with the project's distribution system, enabling functions like graded protection, energy metering, and reactive power compensation, offering a one-stop power distribution solution for the building.