Bosnia Project ・ Switchgear Engineering Case

Figure 1: Switchgear Hoisting and Positioning Operation

The picture shows the core equipment on the project site — an outdoor high-voltage switchyard — being hoisted into place by a truck crane. The equipment cabinet features a standardized modular design, with built-in high-voltage switch units, protection and monitoring devices, and supporting circuits. It can handle power line interruption, protection, and monitoring functions, providing stable and reliable electricity for mixed-use commercial and residential complexes.

Bosnia Project ・ Switchgear Engineering Case

Figure 2: Multi-Unit Cabinet Installation Advancing Synchronously

Multiple substation cabinets are being installed on-site at the same time. Our company is working with the construction team to complete the positioning, leveling, and connection of the equipment. The cabinets use outdoor-specific protective structures, offering rainproof, dustproof, and anti-corrosion features, allowing them to operate stably outdoors for a long time and meet the long-term usage requirements of projects in Bosnia and Herzegovina.



X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies.Privacy Policy